What You Can Legally Build on a Samaná Lot: Zoning Explained

A plain-English breakdown of MITUR Resolución 06/2011 — the zoning regulation that determines exactly what you can build on any lot in Samaná and Las Terrenas, and what it means for your investment.

person writing on white paper
Photo by Luke Southern on Unsplash

Picture this: you have found a 1,500 m² lot on the Samaná Peninsula, 300 metres from the Atlantic. The seller describes it as "buildable" and mentions it could "easily fit a five-bedroom villa." Buying it feels within reach. Then your attorney pulls the zoning file.

The lot sits in a coastal environmental unit with a two-level height cap, a 40% maximum ground coverage rule, a mandatory 60-metre public maritime strip along the water's edge — and your "five-bedroom villa" footprint is almost twice what the regulations permit.

This scenario happens regularly. Not because buyers are careless, but because zoning in the Dominican Republic is technical, geographically specific, and almost never explained properly before the offer is signed.

What Is MITUR Resolución 06/2011 — and Why Does It Govern Your Lot?

Resolución No. 06/2011 (DPP), issued by the Ministry of Tourism, is the binding land-use plan for the entire north coast of Samaná Province. Signed in March 2012 by Minister Francisco Javier García Fernández and officially received by the relevant authority in April 2012, it divides the peninsula into 11 Unidades Ambientales (environmental units) plus road corridors and a special Macro Unidad covering the Las Terrenas area — Cosón, Playa Bonita, El Jobo, the town centre, and El Portillo.

For every one of those units, the resolution fixes four controlling parameters:

  • Maximum ground occupation — the share of the lot's footprint that may be covered by roofed structure
  • Minimum green area — the share of the lot that must remain unpaved or unbuilt
  • Maximum height in levels (stories)
  • Maximum density in rooms per hectare

For many units, it also sets minimum and maximum lot sizes for new subdivisions, minimum road frontage, and setbacks from the front, sides, and rear property lines.

The practical consequence: the same 1,500 m² lot in two different zones on the same peninsula can have dramatically different buildable envelopes. That difference can amount to hundreds of thousands of dollars in potential project value — or a project that simply cannot be built as imagined.

Before you accept an asking price on any Samaná or Las Terrenas lot, use Evalua's Zoning Calculator to see exactly how much of your lot is legally buildable. Land price per square metre means nothing until you know how much of it you can actually cover.

What This Means: A "buildable" lot in Samaná is not a blank canvas. Resolución 06/2011 fixes height, footprint, and density for every zone — and these limits vary substantially across the peninsula. Confirm the parameters before you negotiate a price.

The Beachfront Reality: What the First-Line Rules Actually Say

The most important — and most frequently misrepresented — rules apply to beachfront and near-beachfront lots.

First, the baseline established by Ley 305-68: a 60-metre strip measured inland from the ordinary high-tide line is public domain across every DR coast. You cannot buy that strip, the state cannot sell it, and no one acquires it by possession. Construction within it is prohibited, including provisional structures, unless the Executive exceptionally authorises it for tourism or public-utility purposes — and unauthorised works face court-ordered demolition at the owner's expense.

Resolución 06/2011 then layers additional restrictions on what sits immediately behind that strip. Article 8.1 of the resolution caps the first line — defined as the first 40 metres inland of the 60-metre maritime strip — at two levels maximum, with a maximum height of 7 metres (8 metres for pitched roofs). Article 8.2(c) goes further: roof terraces above the second level are prohibited in this first-line zone, in any case.

Put plainly, if your lot boundary begins at the edge of the 60-metre public zone, your structure directly facing the ocean is limited to two floors and roughly 23 feet. That is before the lot-specific ground coverage rules are applied.

By the Numbers: 60m public maritime strip + 40m first-line restricted zone = 100 metres from the high-tide line before full building flexibility applies. On a 40m-deep beachfront lot, that means the entire lot is subject to first-line restrictions.

This does not make oceanfront lots a bad buy — it explains why they command a premium on a per-buildable-square-metre basis rather than a per-total-square-metre basis. Understanding the distinction is what separates a good deal from an expensive lesson.

an aerial view of a beach with palm trees
Photo by Victor Rosario on Unsplash

How the 11 Environmental Units Differ

The peninsula's 11 Unidades Ambientales are not just administrative labels — they carry meaningfully different development parameters, and the differences matter for project feasibility.

Zone TypeTypical Max HeightMax Ground CoverageMax Density
First-line coastal2 levels / 7m30–40% (varies by unit)Low (restricted)
Town / central zones3–4 levels40–60%Medium-high
Hillside / Lomas2 levels25–35%Very low
Inland / access corridor3 levels45–55%Medium
Highly sloped (>50%)Not urbanizableN/AN/A

The Lomas units — hillside areas — split at slope thresholds. Land with an average slope above 30% faces tighter restrictions; land above 50% is classified as non-urbanizable. This matters considerably in Samaná, where dramatic topography is part of the landscape's appeal but creates real development constraints.

The second unit (officially spelled YAKSON in the resolution, commonly written "Jackson" locally) and several others are delimited not by streets or named boundaries, but by rivers, contour lines, and cadastral parcel numbers held by the Dirección General de Catastro. That is why zone boundaries cannot be reliably read from a map or a satellite image — a competent attorney and, in some cases, a surveyor with the actual resolution in hand is required — working from the parcel's registered title at the Jurisdicción Inmobiliaria, not from a listing description.

Expert Insight: Do not ask a seller or an agent which zone your lot is in. Ask your attorney to pull the resolution and match it to the parcel reference. Zoning boundaries in Samaná run through geographical features, not street grids, and misidentification is common.

How Buildable Area Is Actually Calculated

Article 8.4 of the resolution defines the edificabilidad (buildable floor area) formula:

Buildable floor area = Ground occupation × Number of levels ÷ Lot area

Or in practical terms: multiply your lot size by the permitted ground coverage percentage, then multiply by the number of permitted levels. That gives you the total floor area you can legally build.

A worked example for a standard Las Terrenas condo zone:

  • Lot: 800 m²
  • Max ground coverage: 50%
  • Max height: 3 levels
  • Buildable floor area: 800 × 0.50 × 3 = 1,200 m²

Now apply the same calculation to a first-line coastal lot of the same size:

  • Lot: 800 m²
  • Max ground coverage: 35%
  • Max height: 2 levels
  • Buildable floor area: 800 × 0.35 × 2 = 560 m²

The oceanfront lot yields less than half the buildable envelope despite being the same size. That compressed buildable envelope is why oceanfront projects — whether a private villa or a small boutique hotel — are often denser in amenity spend per square metre rather than in raw size. It also explains why land price per m² of buildable floor area (not per m² of total lot) is the correct metric for comparing lots across different zones.

For a detailed walkthrough of construction costs once you know what you can build, the complete guide to building a house in the Dominican Republic covers contractor costs, timelines, and what to budget for a high-spec finish.

What Resolución 06/2011 Doesn't Cover (and Where to Look Next)

Knowing your zone's parameters is the starting point, not the finish line. A project also requires:

MITUR's environmental permit and No Objection: Article 10(a) of the resolution makes an environmental permit a precondition of MITUR's No Objection letter, issued under the Manual de Tramitación (Resolución 02/2012 DPP). No permit, no construction authorization. The resolution sets the rules; MITUR's permit process enforces compliance.

Municipal building permits: The Ayuntamiento (local municipality) issues its own construction permits. Municipal requirements and those of Resolución 06/2011 must both be satisfied, and in cases of conflict, the more restrictive rule generally applies.

Condominium regime registration: If you are building multiple units, Ley 5038 on condominiums requires formal registration of the condominium regime before units can be transferred individually. This affects project structure, not what you can physically build, but it shapes how you sell or exit.

CONFOTUR classification: If you are building a tourism project and want the 15-year tax exemption under Ley 158-01, as amended by Ley 195-13, CONFOTUR classification is a separate process entirely — applied for project-by-project, never automatic. The resolution does not grant or imply CONFOTUR status.

Bottom Line: Resolución 06/2011 answers "what can I build." The environmental permit answers "have I been authorized to build it." The municipal permit answers "can I start." A developer needs all three, and they are issued by different bodies on different timelines.

Four Due-Diligence Checks Before Signing on Any Samaná Lot

  • Identify the environmental unit: Your attorney should match the parcel reference number to the specific Unidad Ambiental in Resolución 06/2011 — not estimate it from a map.
  • Calculate the buildable envelope: Apply the resolution's ground coverage and height limits to the actual lot dimensions. Compare this to your project concept before negotiating price.
  • Confirm the maritime strip distance: If the lot abuts or is near the coast, measure from the high-tide line — 60 metres is public domain, and the additional 40-metre first-line restriction applies to the zone directly behind it. See our full breakdown of the 60-metre maritime strip rule for what this means in practice.
  • Check for slope restrictions: Hillside lots above 30% average slope face tighter rules; above 50%, the lot is classified non-urbanizable regardless of any other zoning.

Land due diligence does not end with a clean title. A lot can have a registered Certificado de Título and a perfect ownership chain while still being legally unbuildable for the project you have in mind. The two questions — "do I own it cleanly?" and "can I build what I plan?" — are answered by separate processes and separate professionals.

Frequently Asked Questions

Does MITUR Resolución 06/2011 apply everywhere in the Dominican Republic?

No. Resolución 06/2011 applies specifically to the north coast of Samaná Province — from La Majagua/El Catey in the west to Cabo Cabrón/Playa El Valle in the east, bounded to the south by the 300-metre contour. Other regions of the DR have separate municipal zoning ordinances and sectoral plans. Always confirm which authority governs your specific lot's location.

Can I find out my lot's zoning classification online?

Not reliably. The zone boundaries in Resolución 06/2011 are defined by rivers, contour lines, and cadastral parcel numbers — not by a publicly accessible digital map with clickable parcels. Evalua's Zoning Calculator can give you a working estimate based on location and lot characteristics, but formal confirmation requires your attorney to cross-reference the resolution against your parcel's registered data.

If a developer says a project is CONFOTUR-approved, does that mean zoning is also cleared?

No. CONFOTUR approval and zoning compliance are completely separate. A project can hold a CONFOTUR resolution (granting tax exemptions under Ley 158-01) while still requiring a separate MITUR environmental permit and municipal building permit. Verify all three independently before committing capital.

What happens if a structure was built in violation of the zoning rules?

Buildings constructed in breach of Resolución 06/2011 — or, more critically, within the 60-metre maritime zone without Executive authorization — face demolition orders at the owner's expense under Ley 305-68. A buyer who purchases such a property inherits the legal exposure. This is one of the harder-to-spot risks in DR real estate due diligence, and it is specifically why a physical inspection combined with permit verification matters.

Does the 60-metre maritime strip apply to river and lagoon frontage, not just ocean?

Ley 305-68 establishes the 60-metre rule for coasts and beaches. Separate rules apply to rivers and other water bodies under different environmental legislation. If a lot fronts a lagoon or river mouth — common in the Samaná area — your attorney should confirm which regime applies and whether any public-domain restriction affects the buildable boundary.

Can the seller's agent tell me which zone the lot is in?

They can offer an opinion, but you should not rely on it alone. Zone boundaries are defined by technical references in the resolution itself, not by place names or verbal descriptions. An agent may not have the resolution, may not have read Article 28, and has an obvious commercial interest in the sale proceeding. Commission structures in the DR real estate market are explained in detail in our guide on what real estate agents actually charge — which gives useful context on where agent interests and buyer interests can diverge.


The buyers who build successfully in Samaná are not necessarily those with the biggest budgets or the best properties. They are the ones who ran the numbers on buildable area before they ran the numbers on purchase price. Resolución 06/2011 is not an obstacle — it is the document that tells you exactly what your land is actually worth.

Start with Evalua's Zoning Calculator to get a working envelope for any lot you are evaluating, then bring those numbers to your attorney for formal confirmation. The Evalua Blog also covers the full construction process, cost benchmarks, and the legal framework for foreign buyers — everything you need to go from lot to finished project with clear expectations at every stage.

Legal disclaimer: This article is for general information purposes only and does not constitute legal advice. Zoning classifications, building parameters, and permit requirements should be confirmed with a licensed Dominican attorney and the relevant authorities before any purchase or construction decision is made.

Share this article
Email

Get AI-Powered Due Diligence on Any Listing

Before you commit, run any listing through Evalua’s AI analysis for pricing validation, market positioning, and 70+ data points.

Try Evalua Free

This article is general information about Dominican Republic real estate, produced with AI assistance and reviewed by the Evalua editorial team against verified market data and Dominican government sources. It is not legal, tax, or investment advice. Verify details for your specific situation with a licensed Dominican attorney, accountant, or qualified advisor before acting.

Evalua Editorial Team

DR Real Estate Intelligence

Evalua articles are produced by our Samaná-based editorial team using AI-assisted drafting and reviewed for accuracy against verified market data, Dominican government sources, and on-the-ground insight from the Las Terrenas market. Articles are general information, not legal, tax, or investment advice — always consult a licensed professional for your specific situation.

Learn more about Evalua

Talk to a local Samaná expert

A free 15-minute call — due diligence, legal questions, or whether a specific listing makes sense. No obligation.